All three floors were completed to ICD 705 construction standards.
JS Global was prime contractor for the secure construction and renovation of an 80,000 SF Class A office building that houses multiple government agencies and their support contractors. All three floors were built to ICD 705 standards and divided into suites for different uses and security protocols.
The building had to work for several agencies at once, and each suite carried its own requirements.
JS Global delivered the work in two phases. The first phase stripped three stories down and replaced the building’s rooftop systems. The second phase built the secure partitions and finishes that turned the shell into suites for different users.
Demolish walls, ceilings, flooring, and building systems across three full floors.
Replace large rooftop equipment and roofing, and support the new loads with new structure.
Build secure partitions that meet sound and RF requirements while keeping Class A finishes.
Serve several agencies in one building, each with its own use and security protocol.
The first phase removed interior walls, ceilings, flooring, and the mechanical, electrical, and plumbing systems across all three stories.
JS Global installed new membrane roofing, along with structural steel and concrete curbs to carry the new air handling units.
Three large rooftop air handling units and rooftop server room dry coolers were replaced, including a dry cooler serving a secure equipment room.
The team designed, fabricated, and installed new structural steel supports with spray-on fireproofing.
In the second phase, crews built SCIF sound group 3 and 4 partitions using heavy-gauge steel studs, expanded metal, sound insulation, and RF foil.
All three floors were completed to ICD 705 construction standards.
The building was divided into multiple suites to accommodate different uses and security protocols.
New roofing and rooftop air handling replaced the building’s original systems.
High-end finishes and furnishings were installed throughout.
The structure, roof, mechanical systems, and secure partitions all depended on one another.
Because JS Global led the whole building as prime general contractor, the rooftop work, structural supports, and secure build-out were planned as one sequence instead of separate packages.